CP-2026-4003from first noticetalk it throughRoof sheeting lifted at the rear elevation, water ingress into the kitchen. Base cabinets water damaged, walls affected to 1200 mm, skirting and architraves lifted. Guttering displaced. No structural concern.
8 attachedrebuilt on every changeRoof replacement · prepared 15 Sep 2026 · valid 30 days4 attachedClaim 26-04417 · inspected 23 Sep 2026 · Rev A draft12 sectionsby element8 platesIn my opinion the roof sheeting damage and the consequential water ingress are consistent with the wind event of 11 September 2026. The stepped cracking to the rear masonry is consistent with long-term differential foundation movement and predates the event.
412 lines · 11 trades · RFQs to 8 subcontractors| Trade | Basis | Amount |
|---|---|---|
| Demolition | Measured | 18,420 |
| Structure | Measured | 96,300 |
| Carpentry | Measured | 74,850 |
| Ceilings & partitions | Measured | 58,200 |
| Electrical | Quoted | 104,900 |
| Mechanical | Quoted | 99,250 |
| Hydraulic | Quoted | 46,100 |
| Glazing | Quoted | 63,200 |
| Finishes | Measured | 41,900 |
| External works | Measured | 52,700 |
| Preliminaries & general | Rules | 88,400 |
A showreel of what Connected Projects produces: measured capture on a phone, insurance claim scopes and reports, inspection and forensic reports in any template, full tenders and estimates, branded quotes from site, and contract administration through to invoicing. Space pauses, arrow keys skip, R restarts, F goes fullscreen.