Storm damage to the rear roof elevation has allowed water into the kitchen. The recorded damage affects base cabinetry, wall finishes, skirting and architraves. Guttering is displaced.
Site observations, measured capture and photographic evidence inform the accompanying scope. Review and sign-off remain with the assessor.
Quantities drawn from the supplied claim capture. Rates and amounts reproduced from the sample scope.
| NO. | DESCRIPTION | QUANTITY | RATE $ | AMOUNT $ |
|---|---|---|---|---|
| A / KITCHEN | $4,130.00 | |||
| 01 | Remove cabinetry | 1 item | 650.00 | 650.00 |
| 02 | Remove skirting | — | 6.50 | — |
| 03 | Remove wall finishes to 1,200 mm | — | 28.00 | — |
| 04 | Replace wall lining to 1,200 mm | — | 68.00 | — |
| 05 | Paint skirting / architrave | — | 9.00 | — |
| 06 | Paint make-good surfaces | — | 16.00 | — |
| 07 | Replace damaged base cabinets | 2.4 lm | 1,450.00 | 3,480.00 |
| B / EXTERNAL | $43,432.50 | |||
| 08 | Remove existing roof sheeting | 289.55 m² | 24.00 | 6,949.20 |
| 09 | Dispose of old roof sheeting | 289.55 m² | 8.00 | 2,316.40 |
| 10 | Supply & install new roof sheeting | 289.55 m² | 118.00 | 34,166.90 |
| 11 | Perimeter edge protection | — | — | — |
| 12 | Remove existing guttering | — | — | — |
| 13 | Dispose of old guttering | — | — | — |
| 14 | Supply & install new guttering | — | — | — |
A dash identifies a line without a priced total in the source sample. Confirm quantities, rates, allowances and GST before final issue.
Illustrative workflow using supplied app footage and sample documents. A phone runs the Connected Projects assessor app through a real insurance claim — pre-filled claim, spoken walkthrough, Yembo 3D scan, roof trace from aerial imagery, scope, review and submission — then the deliverables appear: the assessment report, the scope of works and the Yembo plans, closing on "insurer-ready in under two hours". Space pauses, arrow keys skip, R restarts, F goes fullscreen. M toggles the soundtrack. Sound starts when you select Sound on.